Kaduna · Abuja · Kano · Lagos

Cut your generator fuel bill by up to 54%

We convert your existing diesel generating set to run on compressed natural gas alongside diesel — no new generator, no pipeline needed. Your engine stays; only its fuel bill changes.

Fuel cost cut
up to 54%
Generator replaced
Never
Gas pipeline
Not required

Typical annual saving

At 10 hours/day, around 62.5% load, current Lagos fuel prices.

  • 40 kVA

    50% CNG target

    ₦11.3 million

    38.8% saved

  • 100 kVA

    70% CNG target

    ₦39.5 million

    54.4% saved

  • 200 kVA

    70% CNG target

    ₦79.1 million

    54.4% saved

  • 500 kVA

    70% CNG target

    ₦197.7 million

    54.4% saved

Run the numbers for my generator

1,000+

vehicles and generating sets converted

4

offices and operating bases nationwide

9

service lines, from a single car to a complete gas plant

Why this matters

Diesel is the single biggest line in your running cost

At 1,700 a litre, a generator that runs ten hours a day can burn through tens of millions of naira in diesel every year. CNG in Lagos costs 380 per standard cubic metre for roughly the same energy — around a fifth of the price.

Keep your generator

A dual-fuel retrofit works with the engine you already own. There is no capital outlay on a new generating set, and if the gas supply is ever interrupted the engine simply runs on 100% diesel as before.

No pipeline required

Piped gas has not reached most Nigerian addresses. We supply your CNG in a cylinder cascade mounted on a wheeled cart that any vehicle can tow to a filling station and back.

Numbers before you commit

Every client receives a written technical and financial analysis of their own generating set before any work is quoted — nameplate data, projected savings, and the risks stated plainly.

The numbers

What a conversion is worth on your generator

Illustrative annual figures at ten hours a day and around 62.5% load. Larger sets are targeted at a 70% CNG substitution average; sets under 100 kVA at 50%.
Generating setCNG targetDiesel only / yearDual-fuel / yearYou save / year
40 kVA50% / 50%₦29,101,450₦17,803,240₦11,298,210
100 kVA70% / 30%₦72,753,625₦33,209,890₦39,543,735
200 kVA70% / 30%₦145,507,250₦66,419,780₦79,087,470
500 kVA70% / 30%₦363,768,125₦166,049,450₦197,718,675
Swipe the table sideways to see all columns →Based on diesel at ₦1,700/litre and CNG at ₦380/SCM, 365 operating days a year, at 0.8 power factor. Your own figures will differ with load profile and running hours — use the calculator for a tailored estimate.

What we do

From one generator to a complete gas plant

Whether you are converting a single set, a haulage fleet, or building the station that fuels them, it is the same engineering team start to finish.

Consultancy & advisory

Feasibility and demand studies, fleet transition planning, owner's engineer review and regulatory advisory — sold on its own, before any equipment decision.

Learn more

Car CNG conversion

Bi-fuel conversion for petrol cars — 100% gas with petrol at the press of a button, and the biggest percentage saving we deliver anywhere.

Learn more

Technical & financial analysis

A written report on your generating set: nameplate data, projected savings at your duty cycle, sensitivity to achieved substitution, and the technical risks.

Learn more

Generator CNG conversion

Supply and fitting of European pilot-ignited dual-fuel kits — gas train, mixer or injectors, dedicated controller, and full safety systems.

Learn more

Truck & fleet CNG conversion

The same dual-fuel principle applied to trucks, tippers and tankers, with cylinder capacity sized against the routes your fleet actually runs.

Learn more

CNG & LNG stations, built from the ground up

Mother and daughter stations, LNG regasification and captive plants — bare plot to commissioned facility, engineered and built in house under one EPC contract.

Learn more

100% CNG generating sets

Spark-ignition gas gensets that burn no diesel at all — no pilot charge, no conversion derate, and around a 75% cut in fuel cost against the diesel set they replace.

Learn more

Dedicated 100% CNG trucks

Factory gas prime movers and rigids running entirely on CNG, with cylinder capacity sized against the corridors your fleet actually runs.

Learn more

Equipment we sell

Cryogenic tanks, regasification skids, compressor packages, CNG process skids, dispensers and nozzles, cascades, certified cylinders and conversion kits.

Learn more

Control & automation

Control panels, automatic transfer switches, generator synchronisation, and SCADA that tells you what your plant is actually doing.

Learn more

CNG cascade & cart

A cylinder bank on a wheeled cart with tyres that any vehicle can tow to a CNG station for refilling, built so more cylinders can be added later.

Learn more

Installation & calibration

Mechanical installation, controller calibration against your real load profile, commissioning, and operator training for your own staff.

Learn more

Our flagship work

We build the CNG and LNG plants our clients run on

Conversions are how most clients meet us. Plant construction is the largest thing we do — and very few firms in Nigeria can convert the vehicle and build the station that fuels it. That is why we can solve a refuelling problem instead of pointing at it.
The LNG chain Roro Technology builds: liquefaction, cryogenic storage at minus 162 degrees Celsius, ISO tank and road tanker transport, a regasification skid at a satellite station, and the client plant it supplies — with the seven EPC stages from feasibility and FEED through civils, mechanical, compression, storage, electrical and commissioning.
Every box on the top row is scope we deliver, through the seven stages beneath it, as one EPC contract.
  • CNG mother and daughter stations — pipeline-fed compression to 250 bar, high-pressure storage, bay loading and dispensing.
  • LNG storage and regasification — cryogenic tanks at −162 °C, vaporisers, letdown and metering, for volumes CNG logistics cannot practically carry.
  • Satellite stations off the grid — sites hundreds of kilometres from a pipeline, supplied by ISO tank or tanker rather than excluded.
  • Captive plants for a single site — sized to one factory or estate’s own consumption, not to a commercial throughput.
  • One contract, one accountable contractor — engineering, procurement and construction together, with our own mechanical, process, electrical and controls engineers.

We also sell the equipment. Cryogenic storage tanks, regasification skids, compressor packages, CNG process skids, dispensers and nozzles, cascades and certified cylinders — specified against how they will actually be used, because we build the plants they go into.

See the full equipment range

Mobile CNG supply

Your gas comes to you, on wheels

The cylinder cascade sits on a low, castor-mounted skid on a cart fitted with tyres. When the cylinders run low, one coupling is released, the cascade rolls onto the cart, and any truck or vehicle tows it to a CNG station and back.
  • One quick-disconnect coupling — a refill trip never disturbs the dual-fuel kit or the generator itself.
  • Rolls by hand on four heavy-duty lockable castors; fork pockets and lifting eyes are built in as a backup.
  • Vehicle-agnostic — not tied to one truck, so whatever is available that day can make the run.
  • Expandable — the frame accepts additional cylinders, or additional skids, as your gas demand grows.
Engineering drawing of the Roro Technology mobile CNG cascade skid, showing front, side and top views with dimensions and key features

Roro Technology mobile CNG cascade skid — design concept

How we work

From nameplate photo to running on gas

  1. 01

    Send your nameplate

    A photo of the generator's rating plate on WhatsApp is enough for us to begin. We identify the set and its prime rating.

  2. 02

    Get the analysis

    We issue a written technical and financial analysis: projected savings at your hours and load, plus the technical considerations.

  3. 03

    Survey & quotation

    A site survey confirms the gas train routing, cascade siting and safety requirements. You receive a firm proforma invoice.

  4. 04

    Install & commission

    We fit the kit, plumb the cascade, calibrate the controller against your real load, and train your operators.

54% / 75%

Fuel cost reduction

Up to 54% converting your diesel set to dual-fuel; around 75% on a 100% CNG set that burns no diesel at all.

ISO 8528

Sets we work with

Cummins, Perkins, Weichai, Mikano, Marapco and other ISO 8528 diesel gensets.

0

Generators replaced

Retrofit only. Your engine, alternator and canopy all stay exactly as they are.

Straight answers

We tell you what a conversion will not do

The 70/30 split is an average, not a constant.

CNG substitution in a pilot-ignited engine is load-dependent. At idle and light load the controller runs on nearly all diesel; substitution peaks in the 60–100% load band. The target is a duty-cycle weighted average, achieved through load-matching and calibration — and we say so in writing rather than promising a fixed ratio at every load point.

Expect a small power derate.

Because CNG carries less energy per unit volume of intake charge and a knock-protection margin is applied, dual-fuel engines are commonly derated by roughly 3–8% versus pure diesel. If your set runs close to its limit, we size for that in the survey.

Check your OEM warranty first.

If your generating set is still within its manufacturer warranty, we will help you confirm the terms with the OEM or dealer before any work begins, so the conversion is planned in a way that protects your cover.

We are hiring

Business Development Managers and certified CNG technicians

Business Development Managers in Lagos, Kaduna and Abuja, and certified CNG conversion technicians in every state where we have a branch. Technicians apply with a short form — no CV needed, and no fee at any stage. Everyone else sends a CV.

Ready to cut your generator fuel bill?

Send us a photo of your generator nameplate and we will prepare a written technical and financial analysis for your specific set — including projected savings at your actual running hours.

Or email sales@rorotechnologies.com